Friday, May 17, 2013

MY ENERGY EFFICIENCY INFORMATION SHARING SERIES IS NOW AVAILABLE AT


For easier sharing of energy efficiency related information through  some of my presentation materials and some that I have received from various events, I have uploaded them in the slides sharing portal at



The following are titles of each presentation that I have uploaded which I hope would enlighten us on certain topics related to energy efficiency in general and also specifically in Malaysia.



I sincerely hope that this might be useful to some of you and other Malaysians too.

TITLE:
  • Effective Green Technology Policies Implementation: An industry player's perspective
  • Proposed National Energy Efficiency Master Plan For Malaysia
  • Pengenalan Kepada Sektor Tenaga, Polisi Dan Perundangan Kecekapan Tenaga  Elektrik
  • Pengenalan Kepada Aplikasi Penjimatan Tenaga
  • Energy Efficiency Standard and labeling in Malaysia 2010
  • Energy Efficiency for Malaysia-the way forward
  • Panduan ringkas amalan kecekapan tenaga di rumah
  • UNEP training for climate change mitigation – lighting
  • Introduction to energy audit part 1
  • Introduction to energy audit part 2
  • Introduction to energy audit part 3
  • EE Initiatives and National EE Master Plan by The Ministry of Energy, Green Technology & Water
  • MIDA networking session on clean technologies-21.2.2013
  • Total energy conservation solutions for manufacturing facilities
  • Zaini’s Energy Efficiency Journey
  • Introduction to effective communication
  • Introduction to energy management system
  • The implementation of Efficient Management of Electrical Energy Regulations 2008
  • Training on Energy conservation for Malaysia(ECMY4)-Group Presentation
  • Introduction to Energy Performance Contracting

Tuesday, May 7, 2013

Registered Electrical Manager Services from my own perspective


Actually this a compilation of my previous posts in three parts...with some added points at the end

To start...just like any other law, the enforcement and monitoring by the regulator is also crucial to ensure the good impacts that could be resulted from EMEER 2008 compliance. 
EC at least need to have the in-house capacity and competent people in EE implementation who at least can guide the affected installations and REEMs for them to be able to look into the actual spirit behind EMEER 2008 rather than just for compliance. EC's roles in educating the installations in directly linked to REEMs that they have certified as their "representative" because if REEMs are not able to convince the installations about the benefits from compliance with EMEER 2008, EC will be  left alone to do it. 
This is another one reason why REEMs are so crucial to ensure the success of EMEER2008 implementation. 

Now, let us examine their effectiveness to promote EE...at least at with installations that they appointed according to the requirements of EMEER 2008.

The Efficient Management of Electrical Energy Regulations was effective from 15 Dec 2008 and it affects consumers and private licences that consume or generate more than 3,000,000kWh in total in 6 consecutive months at any duration from the effective date.

Two key features in the regulations are: 
1. Affected consumers/private licensees must appoint Registered Electrical Energy Manager (REEM) with EC and... 
2. Also required to submit energy management info and updates in a scheduled report to EC in every 6 months

Key duties of REEM in efficient management of energy in general are:
1. To advise on how to implement 
2. To audit 
3. To monitor the implementation 
4. To supervise records and documents are kept 
5. To ensure timely submission of the scheduled report by the installation 

Currently there are about almost 2000 installations affected by the regulations and I am aware that EC has started to send warning notices to those who have not comply since 2011 
please log on into EC's website www.st.gov.my for more info

My REEM Certificate that I finally obtained in early 2012

Based on feedback by some affected installations and also REEMs in the market, we can classify REEMs in few categories now:
1. Appointed as REEM at the installation where he/she is working now (I guess the most of REEMs) for compliance 

2. Appointed as the third party as REEM by affected installations they can be appointed by more than one installation. This group normally consultants. 

3. Not appointed any installation and just keep the certificate as one of their competency recognitions

Comparatively with other countries that have similar competency certificate by EE laws such as Japan and India, to become REEM is much easier due to a very "minimum" requirements in EMEER 2008 for academic qualifications, knowledge and experiences in EE. All that they need to have are at least a degree in engineering, architecture and science with experiences in energy management from 6 months to one years plus an interview session before they can be registered if they pass the interview.

The main concern is....how competent of REEMs in promoting and assisting to implement EE for the affected installations and for other intensive energy users as a whole.
  
Functions and duties of REEM in EMEER 2008 are very general and in can be interpreted in many ways if not being well explained and guided by the regulator. The key objectives  of EMEER 2008 is to ensure energy resources (electrical) is managed efficiently and REEMs are expected to play the critical role for that to happen...

How many installations for REEM can be appointed? How much should REEM charge for each installation? How much should I for REEM services? Will REEM help to save energy? Is energy audit is compulsory and if yes, what type of energy audit that need to be carried out? Detailed, investment grade or walk through? 

It is very crucial for REEMs to be able understand their "real" functions and  duties clearly and convincingly since provisions stated in EMEER 2008 are very brief and general...their ability to do that normally will determine what type of REEM they would be that will lead to what type services to delivered to installations that agreed to appoint them. 

To me...the compliance of affected installations towards EMEER 2008 should only be the minimum requirement for REEM to fulfil which is to verify reports that need to be submitted to EC in every six months. Their further functions should derive from the regulation 16 in EMEER 2008 which is not fully understood the owner of the installation who are mostly new or unaware of it until they received the notification from EC. 

 To my understanding, the spirit of EMEER 2008 is more to give the freedom to each installation to manage their energy efficiently. It can be seen with so many general provisions and minimum mandatory requirements that need to be complied. That actually gives the flexibility to REEM to figure out the best or the most practical package to offer other than just for compliance... 


We will look into this topic further since this will determine the tangible values and benefits in the appointment of REEM in the eye of the installation's owner with the amount of fee that they are willing to pay.

From the market information and communications with some of fellow REEMS ...there are REEMs being paid from about RM500 per month to RM50k+++ per year for services offered to affected installations with about 400 installations have appointed REEM.There are REEMs appointed to many installations and the highest number for one REEM that being told to me is about 20 installations.

I am not going to question about the fees or how many installations for each REEM can be appointed, as a REEM myself, I would to discuss on how every REEM will or should position themselves in the market and how as REEMs, and then we would be able to promote efficient management of energy that will benefit the installation itself and the country as a whole. It's free market and everyone has absolute rights to find the best way to secure clients. 

There are few types of installations too when it comes to on how they look at EMEER 2008.Generally I would like to categorize them as follows: 

1. just would like to comply to avoid issues with the authority, their certification requirements and etc. Management of energy it is not so critical to them especially for purely local companies.

2.Ready to comply since energy management have been implemented for many years

3.Want to comply but delayed their actions due to other important commitment and in the same time findings it hard to get REEMs due to insufficient supply and unsure about how much values REEM will bring with the costs that they need to fork out. They are also raised concerns on lack of reference/guidance/benchmark on the scope of works of REEM to deliver with proposed fees.

4. With wait and see attitude...trying to delay it if possible

5.Just do not care at all

6. The management are not aware about it at all

7. Keen to comply and immediately and taking necessary actions to indicate their on-going commitment as "green" or law abiding organizations

There are may be more but what I am going to highlight here are...

firstly, for different type of organizations, REEMs have to have different approaches to sell themselves to get appointed with the suitable scope of works to fulfil each installation's requirement and their perception towards EMEER 2008.
Secondly, how REEMs position themselves in the market will create the perception towards them among the affected installations as a whole and companies that appointed them, fellow REEMs and also from the regulator's point of view. 

I came across installations that we have EE projects with them that shared with us some of their experiences with REEMs that they have appointed. For companies that appointed REEMs from their qualified internal personnel, normally they do not have that many issues with their REEMs. Negative comments normally come from companies that appointed external REEMs that could not see or realize the benefits despite paying certain amount of fees on monthly basis other than complying to EMEER 2008. 

Personally, there are companies send me enquiries on REEM services that I am also offering as one of our consultancy services. I would say almost all of them just interested to appoint REEM for the purpose of compliance only and looking for the "best price" which normally the cheapest price.
Some of them already received warning notices but still do not take it as an urgent matter yet. Why? I will try to elaborate on the later or sometime in the future posts since my focus now in on REEM.
Both REEMs and affected companies need to be guided and the only party who can do that is the regulator itself because what is happening now is the true spirit of EMEER 2008 is not fully understood for them to see the positive impacts that could be resulted from the enforcement of the law. There must me a synchronized efforts among the regulator, REEMs and affected companies to act on roles as specified in the law  for us to see the actual desired impacts from the introduction of EMEER 2008.
The diagram below summarized roles that need to be played by each actor in EMEER 2008 implementation to enable the law to achieve its objectives.


Relationship and roles of key actors in EMEER 2008 implementation

Obviously the biggest roles that need to be played are by the regulator especially in the early part of the implementation. The regulator must have strong and competent EE capacity within the organization to enable them to perform their functions effectively especially when installations and REEMs refer to them for clarity about provisions in the law and assistance on how to practically move towards the compliance.
The other biggest challenge of the regulator is to create significant interest among the technical people to apply to become REEM, to register them and to ensure REEMs will play their roles after that. With less than 200 REEMs registered at this moment, it definitely insufficient for the market and with many of REEMs are based on their existing workplace as a full time employees, the total number of REEM that would be able to ensure at least the compliance is far less than enough. This has already created unhealthy environment in REEM market when the demand is too much more than the supply where some REEMs are willing to rush the quantity rather than the quality of services delivered. 
On-going campaign to increase awareness on the potential of new career and business opportunities is required to attract more EE professionals, practitioners and others with related EE working experience to apply to become REEM.

To become REEM under EMEER 2008, you do not have to a technical specialist or specialized in other areas in EE. Then, appointment of REEM by any company for the purpose of compliance only will not guarantee any energy cost reduction yet. However, being a specialist in certain areas especially on how to identify and implement energy cost saving measures definitely will bring more values to companies appointed them as REEM at their facilities. I will try to share some tips in my future postings on how easy to become REEM is you already met the qualification requirements and experiences in energy efficiency.


REEMs normally will ask and share information and experiences their fellow REEMs on what they actually do to secure, deliver their services and to maintain their clients. Meanwhile companies will normally refer to the regulator to confirm about the requirements to comply and then REEMs in the market to gauge what type of services could be offered and fees. Companies also will ask other companies and finally they will decide based on their actual needs to appoint REEM. Without a proper advice and guidelines, companies may end up appointing REEM with their own reasons and not in tandem with the objectives of EMEER 2008 implementation. This scenario must closely monitor by the regulator and to close the gaps on different perceptions and assumptions by companies and REEMs about complying towards EMEER 2008.
The general understanding about EMEER 2008 is they need to implement energy saving measures which is not totally correct since the focus of the law is on the management of energy at the affected installations. This is where the regulator needs to explain clearly and extensively to them that the law is not all about energy savings. EMEER 2008 is actually focusing on the management component of total energy management solutions which also cover the technical component which directly related to energy saving measures. When the energy resources are being managed efficiently, it will subsequently will result in identifying ways to eliminate wastage that will improve energy resources utilization in the facilities.
To put so much emphasis on energy savings will create the impression of quickly to jump into possible immediate measures to be implemented if they need to comply to EMEER 2008 and measures can be quickly associated with costs to implement too which shift the attention to EE technologies(products).


TYPES OF REEM

To become a REEM under EMEER 2008, you do not have to a technical specialist or specialized in other areas in EE. Then, appointment of REEM by any company for the purpose of compliance only will not guarantee any energy cost reduction yet. However, being a specialist in certain areas especially on how to identify and implement energy cost saving measures definitely will bring more values to companies appointed them as REEM at their facilities.

Now I would like to elaborate further on what type of REEM that anyone possibly could be. To be realistic too, monetary factor would be one of the key factors among others. 

Another key factor is what is the market(installations affected by EMEER 2008) expects from REEMs which very much depending on how they see the implementation of the law as I indicated in the previous post.

I am not trying determine  to which one is right or wrong but would like to bring the attention to achieve goals from the implementation of EMEER 2008 other than potentials business opportunities.

The  figure below outlines on  how I anticipate the scope of services that could be offered and roles to be played by REEMs:


 


  • Compliance Services


  1. To me, when monetary benefit is the ultimate goal by being REEM, promising to ensure the basic compliance requirements is met would match the need of companies which have the same interest. For these types of REEMs, their scope will only require them to be appointed by the company and sign the declaration form (Form B) in every six months. All EEM works generally will be up to the company with appointed REEM will provide minimal inputs. 
  2. With the minimum works required, fees for this type of scope normally will be minimum too and extra scopes will require the company to be charged separately upon request by the company. There will be no fixed commitment such as of number of visits, type of reporting or details of service level agreement by the REEM. With this approach, one REEM would be able to offer their service to many companies.
  3. I do heard now  some companies that are now questioning the value REEMs appointed by them who are not really doing much to help them to save energy despite being paid a fixed fee every month. For some companies, they are all right with it since that is exactly their requirement, just to comply with EMEER 2008.
  4. For this type of scope, generally REEMs are not required to be well-versed in overall concept of energy management and even in energy conservation measures too because they do not expect themselves to  deliver that although their client may(indirectly due to the minimum fee agreed).

  • ·                     Efficient Energy Management(EEM)Services  

  1. This is an enhanced scopes of REEM with the key addition is about assisting the company to have a comprehensive energy management system (EnMS) implemented at agreed time frame. The energy management system will cover both management and technical solutions that finally will lead to reduction of energy consumption and costs. This may involve adoption of recognized energy management standards such as ISO50001 standard.
  2. REEMs who are able to offer this EEM services have to be familiar on the key concepts of EnMS from the development, implementation and evaluation for continual improvement. Bear in mind the goal is not about to lead or to get the company to be certified but to have a system in place within the company that would enable them to achieve their energy targets and then sustain it with or without REEM. The effective implementation EnMS is expected to enable the company to save energy costs at NO or LOW cost measures to start with before they can embark into bigger financial investments on energy saving measures which will lead them to have more significant savings.
  3. REEMs are expected to be more involved with the company and for easier understanding of commitment required from both parties, REEMs are advisable to prepare and submit their energy management plan to develop and implement EnMS which to be mutually agree by both of them too.
  4. Since there are  more roles and time to be spent, we expect higher fees to be proposed and justified by REEM to their potential clients and then to convince them to accept the proposed scopes.
  5. Normally, if both parties agreed with the proposed plan and fees, REEMs have the biggest challenge to deliver to justify fees that being charged. This is because, the company will have some more inputs at the later stage after the appointment made from their contacts on scope that being offered by other REEMS for compliance alone.
  6. The failure of REEMs to prove their value to their clients with have significant impact on the perception of affected company towards  other REEMs since with this type of scopes, REEMs are expected to be specialist sin EnMS or energy efficiency measures who will advise and guide the company in efficient management of energy.
·                     EEM mentor

  1. Further the services offered for the above two types of REEMs, EEM Mentor would have the approach and strategy to deliver our REEM services to cover the following:
  • REEM will identify competency requirements and develop in-house competencies through  training programs  on EnMS and EE related topics; and
  •  REEM will be a mentor to for in-house candidates  who will  apply to be a REEM with Energy Commission  and will assume the functions and duties as REEM after  the appointed external REEM services contract ended
  • The external REEM may play advisory roles or for specialized services upon request by the company on need basis.
  • Generally, this type of REEMs would only willing to be appointed at certain numbers of companies only at one particular duration which will make them eligible to offer their services at 3-4 companies at one time. This is due to the need for them to give due attention to each company which require constant assistance and guidance before REEM's tasks could be finally handed over to the in-house REEM towards the end of their contract


At this stage, it is hard to gauge what type REEMs are currently the majority in the market since the actual scope of services is only known between REEMs and their respective clients. As someone who currently holds that REEM registration and to those who have intention to get one, it is entirely up to you to decide what type of REEM are you or you will be.

In a bigger picture, the effective implementation of EMEER 2008  could also contribute to the growth of our economy and reduction of carbon dioxide gas emission through the reduction of energy consumption with efficient management of energy at affected installation as summarized in the figure below.


Monday, May 6, 2013

PANDUAN RINGKAS PELAKSANAAN PROJEK PENJIMATAN TENAGA DENGAN KONSEP KONTRAK PRESTASI TENAGA

APA ITU KONTRAK PRESTASI TENAGA?...

Pengguna tenaga mempunyai beberapa pilihan untuk melaksanakan langkah-langkah penjimatan tenaga yang dikenal pasti daripada audit tenaga. Bagi langkah-langkah penjimatan yang kosnya  rendah, banyak organisasi mungkin boleh memperuntukkan bajet  dalaman tetapi langkah-langkah yang memerlukan jumlah kos atau pelaburan yang lebih besar daripada dengan memindahkan risiko pelaburan yang diperlukan, Kontrak  Prestasi Tenaga atau Energy Performance Contracting (EPC)  adalah salah satu pilihan yang praktikal untuk mencapai  penjimatan kos penggunaan tenaga yang ketara  .

Konsep EPC untuk pelaksanaan langkah-langkah atau projek penjimatan tenaga ialah melalui pelaburan langsung oleh Syarikat Perkhidmatan Tenaga atau Energy Services Company(ESCO) dengan "Kos Sifar"  kepada pemilik atau pengurusan kemudahan bangunan atau perindustrian di kemudahan-kemudahan yang telah dikenalpasti mempunyai potensi yang besar.  Pulangan daripada pelaburan akan digunakan untuk membayar balik ESCO hanya daripada penjimatan tenaga sebenar yang dicapai  hasil daripada pelaksanaan langkah-langkah penjimatan tenaga yang dilaksanakan oleh  ESCO berdasarkan kontrak berkongsi penjimatan dengan syarat-syarat  yang dipersetujui oleh kedua-dua pihak.


MODEL PELAKSANAAN EPC

Terdapat dua model yang  biasa di amalkan dalam melaksanakan EPC di antara ESCO dan pelanggan atau pemilik kemudahan. Kedua-dua model memerlukan ESCO untuk melaksanakan tugas-tugas seperti yang dinyatakan sebelum ini, dengan perbezaan utama dalam keadaan kos sebenar penjimatan untuk dikongsi bersama atau dibayar kembali kepada ESCO. Terdapat dua model perkongsian  penjimatan dan  Model Jaminan Prestasi


1. Model perkongsian  penjimatan tenaga

Komponen utama dan mekanisme model perkongsian penjimatan tenaga ditunjukkan di dalam Rajah bawah.

Komponen dan mekanisme Model Perkongsian Penjimatan Tenaga

Dalam model penjimatan bersama penjimatan kos sebenar yang dicapai dikongsi pada peratusan yang dipersetujui bagi setiap pihak dengan syarat-syarat yang dipersetujui antara ESCO dan pelanggan



2. Model Jaminan Prestasi Tenaga

Komponen dan mekanisme Model Jaminan Prestasi ditunjukkan dalam Rajah bawah.

Komponen dan Mekanisme dalam Model  Jaminan Prestasi  Tenaga
Dalam model jaminan pretasi, ESCO akan menjamin penjimatan kos tenaga pada amaun yang telah dipersetujui kepada pelanggan dengan kegagalan ESCO untuk menyampaikan jumlah yang akan menyebabkan mereka perlu membayar perbezaan kepada pelanggan

MEKANISME DAN LANGKAH-LANGKAH PELAKSANAAN EPC

Secara umum, langkah-langkah utama dalam pelaksanaan model EPC ditunjukkan dalam dalam turutan berikut atau seperti carta aliran berikut dalam Rajah di bawah.

  1. Pengesahan Keperluan EPC
  2. Penyediaan maklumat , Objektif, Kriteria Penilaian dan Panduan  Pelaksanaan Projek EPC
  3. Hebahan  dan Penyenaraian ESCO yang layak
  4. Jemputan menghantar cadangan oleh ESCO yang layak
  5. Penilaian Cadangan Daripada ESCO
  6. Perlantikan ESCO
  7. Audit Tenaga Terperinci dan Penghataran Cadangan Pelaksanaan & Pelaburan Oleh ESCO
  8. Rundingan Syarat-Syarat Kontrak EPC
  9. Tandatangani Kontrak EPC
  10. Pelaksanaan Projek Penjimatan Tenaga
  11. Pemantauan dan Pengesahan Penjimatan Sebenar Yang Dicapai dan Pembayaran Bulanan Kepada ESCO



Carta alir mekanisme yang ditunjukkan di atas dicadangkan untuk digunapakai bagi sistem tender terbuka oleh pihak pemilik kemudahan untuk mendapatkan ESCO yang berkelayakan untuk melakasanakan projek penjimatan tenaga di premis mereka.

Mekanisme pelaksanaan EPC yang ditunjukkan di atas juga boleh diubahsuai mengikut kesesuaian dan prosedur kewangan sesebuah organisasi. Adalah amat penting untuk pihak pemilik kemudahan atau pelanggan mempunyai pemahaman yang secukup tentang konsep EPC kerana ia akan melibatkan satu tempoh perjanjian dan komitmen pembayaran dalam tempoh masa yang agak panjang.

FAEDAH-FAEDAH PELAKSANAAN PROJEK PENJIMATAN TENAGA DENGAN KONSEP EPC

Penggunaan konsep EPC telah diamalkan secara meluas di sektor kerajaan dan terutamanya  di swasta  di negara-negara seperti di Thailand, Jepun dan Amerika Syarikat yang mempunyai  faedah-faedah berikut:

  1. Keupayaan untuk melaksanakan langkah-langkah penjimatan tenaga dengan "sifar " pelaburan oleh pemilik kemudahan bangunan melalui prestasi berdasarkan konsep dan melabur hasil daripada penjimatan kos tenaga  yang dicapai dalam projek-projek lain;
  2. Untuk memastikan mekanisme dan sumber pembiayaan yang mampan untuk melaksanakan langkah-langkah penjimatan tenaga untuk pengurusan tenaga yang lebih cekap;
  3. Satu kontrak tunggal untuk menangani pelbagai projek-projek penjimatan tenaga melalui pelaksanaan setiap langkah penjimatan tenaga yang dikenal pasti daripada audit tenaga;
  4. Risiko dipindahkan kepada pihak ketiga iaitu ESCO yang berkelayakan  atas dasar perkongsian keuntungan dengan teknologi yang telah terbukti dan kepakaran dan
  5. Kaedah yang berkesan untuk melaksanakan langkah-langkah penjimatan tenaga untuk menggalakkan penjimatan tenaga dalam kemudahan kerajaan dan swasta oleh mekanisme pelaburan pasaran -swasta

Bagi sektor kerajaan, penggunaan konsep EPC akan meringankan beban kewangan perbelanjaan kerajaan untuk melaksanakan langkah-langkah penjimatan kos tenaga yang mampan dalam bangunan dan kos itu akan dapat dibelanjakan untuk tujuan-tujuan yang lain.

Bagi syarikat-syarikat swasta, EPC akan membolehkan pihak ketiga yang berwibawa untuk mengenal pasti dan melaksanakan langkah-langkah penjimatan tenaga semasa mereka memberi tumpuan kepada perniagaan teras mereka. Dalam kedua-dua sektor, mekanisme EPC akan membolehkan mereka untuk memindahkan komitmen dan risiko kewangan untuk melabur dalam projek-projek EE kepada pihak ketiga dan dalam masa yang sama memberi jaminan simpanan yang akan memberi manfaat dalam jangka masa yang lama.


SIAPA YANG BOLEH MENGGUNAKAN KONSEP EPC?

Sektor Kerajaan

Bagi bangunan-bangunan  yang  di miliki atau di gunakan oleh pihak kerajaan di mana bayaran bil elektriknya dibayar oleh pihak kerajaan  persekutuan, terdapat beberapa syarat-syarat yang perlu dipatuhi untuk mengguna pakai konsep EPC di bangunan masing-masing iaitu:

  1. ESCO  berkenaan mestilah telah berdaftar dengan Kementerian Kewangan di bawah kod  222801: Perkhidmatan Teknologi Hijau dimana ESCO juga dikehendaki berdaftar sebagai ESCO  dengan Suruhanjaya Tenaga sebelum didaftarkan oleh pihak Kementerian Kewangan di dalam sistem e-perolehan kerajaan.
  2. Bil elekrik semasa dicaj di bawah Objek Sebagai (OS)23000-Perhubungan dan Utiliti. Bagi perkhidmatan yang diberikan oleh syarikat yang melaksanakan EPC yang dapat menghasilkan penjimatan, perkhidmatan oleh ESCO boleh dibayar di bawah OS29000-Perkhidmatan Ikhtisas dan Perkhidmatan Lain yang dibeli dan Hospitaliti.
  3. Oleh kerana kedua-dua bayaran di atas tersebut boleh dibuat di bawah Objek Am(OA) yang sama OA 20000-Perkhidmatan dan Bekalan, Pegawai Pengawal di setiap  agensi mempunyai kuasa untuk membuat pengubahsuaian peruntukan yang sewajarnya daripada OS23000 kepada OS29000 untuk membiayai pembayaran kepada ESCO jika peruntukan tidak mencukupi di bawah OS29000,
  4. Dalam melaksanakan EPC juga,agensi hendaklah mempastikan perbelanjaan pelaksanaan EPC tidak melibatkan sebarang tambahan perbelanjaan malahan ia mesti memberi penjimatan kepada kerajaan.
  5. Bagi agensi-agensi kerajaan di di bawah kuasa kerajaan negeri atau yang mempunyai kuasa autonomi dalam pengurusan kewangan masing-masing seperti  badan-badan berkanun dan sebahagian institusi pengajian tinggi awam, penggunaan konsep EPC  adalah terpulang kepada prosedur  dan peraturan-peraturan yang mesti dipatuhi oleh organisasi masing-masing.

Sektor Swasta


Untuk sektor swasta, mana-mana pihak yang berminat untuk mengamalkan konsep EPC, ia adalah terpulang kepada prosedur kewangan yang diamalkan oleh oleh syarikat masing-masing.

PEMILIHAN ESCO

Pemilihan ESCO yang berkelayakan dan berkemampuan adalah amat-amat kritikal di dalam menentukan kejayaan pelaksanaan konsep EPC untuk mencapai penjimatan tenaga seperti yang telah anggarkan.
Selain daripada mempunyai kemampuan daripada segi kepakaran teknikal untuk mengenalpasti potentsi penjimatan tenaga dan melaksanakan projel atau langkah-langkah  yang dicadangkan, terdapat beberapa kriteria lain yang mesti diberi pertimbangan. Di antaranya ialah:

  1. Keupayaan sumber  manusia dalamandiperingkat penggurusan tertinggi dan operasi  daripada  segi  jumlah dan kelayakan-kelayakan professional/ teknikal yang diperlukan untuk  menguruskan dan melaksanakan projek –projek EPC
  2. Keteguhan kewangan syarikat untuk membiaya sesuatu projek sama ada dengan menggunakan sumber kewangan dalaman atau berkelayakan untuk membuat pinjaman daripada mana-mana institusi kewangan.
  3. Rekod prestasi dan pengalaman dalam melaksanakan projek-projek dengan konsep EPC  termasuk skala pelaburan dalam projek-projek berkenaan

Sebagai panduan, pihak Malaysia Association of Energy Services Company(MAESCO) telah mencadangkan senarai kriteria untuk menilai  sesuatu ESCO yang boleh digunapakai atau sebagai rujukan asas berdasarkan maklum balas dan pengalaman ahli-ahlinya dalam melaksanakan projek-projek EPC.
Senarai kriteria tersebut adalah seperti berikut:

i)     Modal Berbayar
Modal berbayar syarkat mesti lebih daripada  RM 100,000

ii)    Skop Kerja
Berkemampuan untuk melaksanakan kerja-kerja berikut:
·  Audit tenaga;
·  Perundingan kecekapan dan penjimatan tenaga;
·  Kejuruteraan reka bentuk cekap tenaga;
·  Pembiayaan pelaksanaan projek kecekapan dan penjimatan tenaga;
· Pelaksanaan dan pengurusan projek kecekapan dan penjimatan tenaga;
· Pemantauan dan pengesahan prestasi (performance monitoring and verification);
·  Uji dan ujiterima (testing and commissioning)
·  Operasi dan penyelenggaraan

iii)    Pengurusan Tertinggi Kecekapan dan Penjimatan Tenaga
Ahli pengurusan tertinggi terdiri daripada komposisi pemegang setiap kelayakan-kelayakan seperti berikut:
·  Pengurus Tenaga berdaftar dengan Suruhanjaya Tenaga; atau
·  Jurutera berdaftar dengan Lembaga Jurutera Malaysia; atau
·  Juruukur Bahan/Arkitek berdaftar dengan LJBM atau LAM; atau
·  Ekonomi/Akauntan hendaklah berdaftar dengan MIA; atau
·  Jurutera kompeten berdaftar dengan Suruhanjaya Tenaga


Pengalaman kerja minima 5 tahun bagi setiap ahli Pengurusan Tertinggi selepas mendapat ijazah.

Lain-lain rujukan seperti keahlian dengan  Malaysia Association of Energy Services Company(MAESCO), Malaysia Energy Professionals Association(MEPA) dan lain-lain badan berkaitan yang diktiraf.

iv)  Kumpulan Perkhidmatan Teknikal atau Pakar*
Diwajibkan mempunyai seorang kakitangan dalam perkhidmatan teknikal atau pakar dengan kelayakan minimum seperti berikut:
·  Sekurang-kurangnya pemegang ijazah Kejuruteraan/Arkitek** atau
·  Pengurus Tenaga Elektrik berdaftar dengan Suruhanjaya Tenaga

* Sekurang-kurangnya seorang yang dicarum dalam KWSP
**Sekurang-kurangnya berpengalaman selama 5 tahun dalam menjalankan perkhidmatan yang berkaitan penjimatan tenaga


v)   Kumpulan Sokongan Teknikal
Diwajibkan mempunyai sekurang-kurangnya  dua (2) orang kakitangan yang sekurang-kurangnya pemegang sijil atau diploma dalam bidang teknikal yang diiktiraf yang dicarum dalam KWSP.


vi)  Keempunyaan* Peralatan dan Kelengkapan Asas Audit    Tenaga
Sekurang-kurangnya mempunyai peralatan dan kelengkapan asas untuk menjalankan audit tenaga seperti berikut:
·  Power data logger
·  Thermal data logger dan meter
·  Flow data logger dan meter
·  Combustion analyzer

*dimiliki/disewa/dipajak



CONTOH-CONTOH PROJECT DENGAN KONSEP EPC

Terdapat banyak contoh pelaksanaan projek penjimatan tenaga dengan konsep EPC di Malaysia terutamanya di kalangan sektor swasta. Ini adalah kerana EPC bukan sahaja menjimatkan kos operasi malah ia juga meningkatkan keuntungan syarikat dan daya saing di kalangan pemain-pemain industri yang sama di dalam pasaran di tempatan dan juga antarabangsa.

Di bawah ditunjukkan beberapa contoh jenis kemudahan dan penjimatan kos tenaga yang telah dan masih sedang dicapai dengan konsep EPC di sektor  swasta di Malaysia.


















KESIMPULAN

Secara ringkasnya, perbandingan antara kaedah EPC dan konvensional bagi pelaburan untuk melaksanakan langkah-langkah penjimatan tenaga boleh dinyatakan dalam jadual berikut.



Perkara
EPC
Pembelian Konvensional
Kepakaran Teknikal
ESCO
ESCO
Pelaksanaan/Pemasangan
ESCO
Pemilik
Sumber kewangan/pelaburan
100% ESCO
100% Pemilik
Kadar perkongsian penjimatan
pada kadar yang dipersetujui bersama
100% kepada pemilik
Risiko-risiko pelaburan dan teknikal
ESCO
Pemilik
Penyelenggaraan dan pemantauan prestasi
100% ESCO
Pemilik
Perbandingan antara Kaedah EPC dan Konvensional untuk melaksanakan langkah-langkah penjimatan tenaga.

EPC juga menawarkan situasi menang-menang pada akhirnya di mana:

  1. Kedua-dua belah pihak akan mendapat faedah daripada pengurangan kos penggunaan tenaga oleh pemilik kemudaha dan peluang mengembangkan perniagaan oleh ESCO
  2. Mewujudkan peluang-peluang pekerjaan yang baru untuk rakyat Malaysia melalui perkhidmatan-perkhidmatan yang diperlukan seperti audit tenaga,pengukuran prestasi tenaga dan lain-lain lagi.
  3. Meningkatkan jumlah perniagaan yang berasaskan pengetahuan atau knowledge-based kerana perkhidmatan oleh ESCO dalam EPC lebih merupakan sebagai penyedia penyelesaian berbanding sebagai penyedia teknologi atau barangan.
  4. Penjimatan tenaga juga akan menyumbang ke arah pengurangan pelepasan gas karbon dioksida yang terhasil daripada pembakaran bahan-bahan api berasaskan fosil seperti minyak untuk  penjanaan tenaga elektrik.

Nota:

Panduan ini telah ditulis berdasarkan pengalaman, perbincangan dan  rujukan  daripada beberapa sumber yang terdapat di internet yang berkaitan dengan pelaksanaan EPC di Malaysia dan juga di negara lain seperti Amerika Syarikat. Semoga apa yang dikongsi di sini dapat memberikan sedikit pemahaman dan panduan kepada para pembacanya tentang apa itu EPC dan bagaimana ia boleh dilaksanakan